Codes of Practice
Detail the technical requirements for Metering System
Code of Practice 10: The Metering of Energy via Low Voltage Circuits for Settlement Purposes
Code of Practice 11: Code of Practice for the Metering of Balancing Services Assets for Settlement Purposes
Code of Practice 1: The Metering of Circuits with a Rated Capacity Exceeding 100 MVA for Settlement Purposes
Code of Practice 2: The Metering of Circuits with a Rated Capacity not Exceeding 100 MVA for Settlement Purposes
Code of Practice 3: The Metering of Circuits with a Rated Capacity not Exceeding 10 MVA for Settlement Purposes
Code of Practice 4: The Calibration, Testing and Commissioning Requirements of Metering Equipment for Settlement Purposes
Code of Practice 5: The Metering of Energy Transfers with Maximum Demand of up to (and Including) 1MW for Settlement Purposes
Code of Practice 6: The Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes
Code of Practice 7: The Metering of Energy Imports via Low Voltage Circuits Fused at 100 AMPS or Less per Phase for Settlement Purposes
Code of Practice 8: The Metering of Import Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes
Code of Practice 9: The Metering of Import and Export Active Energy via Low Voltage Circuits for Non-Half Hourly Settlement Purposes
Code of Practice A: The Metering of Electricity Transfers between National Grid Company plc and Public Electricity Suppliers using the National Interim Metering Schemes
Test New Document - Metadata